中文字幕在线免费看线人 I 中国熟妇内谢69xxxxx I 无码熟妇人妻av在线影院 I 狠狠躁三区二区久久天天 I 亚洲精品福利在线 I 日本aⅴ亚洲精品中文乱码 I 91综合激情 I 免费色片网站 I 久久人人97超碰精品 I 日韩91视频 I 曰韩无码av一区二区免费 I 熟妇人妻不卡中文字幕 I 久久久久久草 I 色窝窝无码一区二区三区成人网站 I 天天视频亚洲 I yy6080理aa级伦大片一级 I 精品精品国产高清a毛片牛牛 I 99久久精品免费看国产交换 I 日韩成人在线观看视频 I 亚洲 另类 日韩 制服 无码 I av一区二区在线播放 I 少妇黄色一级片 I 日日操操 I 免费成人在线观看 I 日韩精品无码二三区a片 I 2024av在线播放 I 激情中文小说区图片区 I 亚洲人成国产精品无码果冻 I 中文字幕日韩久久 I 91视频观看 I 免费人成在线观看网站 I 国模吧人体私拍 I 打美女屁股外国网站 I 意大利gay巨大粗又长 I 日本女人性视频

Welcome to Ark clan group official website!
Corporate Hotline:400-991-8966
Toll-free hotline

400-991-8966

Residential container - an alternative to mobile housing

Source: Time:2019-12-18 16:19:53 views:

Residential container is the product of the replacement of mobile housing, which is superior to mobile housing in all aspects. Now, in addition to customers' requirements of "flat price, easy to move and more comfortable", the number of customers renting container rooms is on the rise.
Residential container is the product of the replacement of mobile housing, which is superior to mobile housing in all aspects. Now, in addition to customers' requirements of "flat price, easy to move and more comfortable", the number of customers renting container rooms is on the rise.



, steel structure and sandwich caigang products are mainly used for the material, the framework includes four main columns, beams, up and down the floor with heavy beams adopt 12 cm channel steel structure, sandwich board for double color plate, built-in flame retardant insulation material (12 kg / ㎡) international, building wall smallpox adopt sandwich choi steel plate, the surface of cement structure ceramic tile laid floor (slippery wear-resisting brick), double open convection push-pull type window, stainless steel burglar mesh, water and electricity, cable, telephone lines, water, air conditioning, vent hole, a variety of basic life form a complete set of equipment in place. Most suitable for collective dormitory, office, shop, aseptic room, meeting room, temporary laboratory and other temporary rooms, flat ground, lifting and installation, only need to connect external power supply can be used.



Assuming that the removable panel house is dismantled and installed once a day, a week later, that is, seven times after the demolition and installation, the roof, side panels and other vulnerable parts have been delaminated, deformed, unable to continue the assembly. The service life of the container is ten years, lifting once a day, that is, it can handle 3650 times, the turnover times of the mobile board room 520 times.



Now activity of dismantling houses dismantling artificial cost generally in 60 yuan/square metre, decorate condole carries on the loss in 30 yuan/square metre, circuit loss in 30 yuan/square metre, floor tile loss in 20 yuan/square metre, door, window, plates, screws, etc. Loss in 20 yuan/square metre, total loss of 160 yuan per square metre. And the container relocation cost is far from, suppose a site to be moved from Guangzhou Haizhu district to Guangzhou Baiyun District, the general crane car lifting cost of about 300 yuan each, according to 7.3m×3m projection surface calculation, each square meter of the relocation cost is 13.6 yuan, relocation cost for the activity of the board room.



Imagine that thousands of workers were removed from a large construction site, and each worker dismantled his own bed frame, carried his own bedclothes and mosquito nets, and had to help the managers carry office supplies. Even the new construction site was still not built, and it rained again. What a troublesome thing it was. And the box-type room to do workers' dormitories, offices, kitchens, toilets, etc., all the articles for daily use hang away, that is how fast and easy.



Ark clan group production of container upper and lower two layers are using heavy cement ceramic tile floor, up and down or so with screw connection into a whole, still can use expansion screws on the base, if you want to blow the whole row of container, estimated inland haven't the grades of typhoon, ark of container with flame retardant foam thermal insulation layer, cement floor also laid on the second floor tile, unlike prefabricated houses, which USES the flammable wood floor, and sound insulation is not good. In short, the cabinet family of containers in the wind resistance, fire, sound insulation and other properties are superior to the activity of dismantling board room.



We are professional, rigorous, scientific, efficient, a team, people-oriented, abide by the credibility, mutual win-win, response to the relevant government policy requirements; The company is committed to the conservation society, saving emission reduction protection of the natural environment as its own responsibility. Go beyond yourself and give back to the society!